Kitchen Remodeling in Pleasanton, CA: Open-Plan Kitchens Built Around How You Cook
Smith & Son remodels kitchens across Pleasanton, in Ruby Hill, Vintage Hills, Kottinger Ranch, Val Vista, Pleasanton Meadows and downtown, from opening a walled-off kitchen to the family room to full gut remodels with new layouts, cabinetry, islands, lighting and the structural work to remove walls. We are a licensed general contractor based in Antioch, with design-build planning, a fixed-price proposal and daily site supervision on every Pleasanton kitchen.

Remodeling a Kitchen in Pleasanton: What We Know Going In
Pleasanton’s homes are mostly 1970s to 1990s two-story homes in Val Vista, Pleasanton Meadows and Vintage Hills, larger 1990s and 2000s homes in Ruby Hill and Kottinger Ranch, and older homes near downtown. Almost all of them were built with a compartmented kitchen, and the single most requested change is to open it to the dining or family room. That is a structural job as often as not: a bearing wall comes out, a beam goes in, and the floor and ceiling get patched so nobody can tell. We handle the engineering, the permit and the finish work as one package, and we plan the electrical and plumbing for the kitchen you actually want, not the one the house came with.
Permits come from the City of Pleasanton’s Building and Safety Division; any kitchen that moves plumbing, electrical or walls needs one, and we pull and manage it. Valley clay is expansive, so slabs and footings are engineered from a soils report. Several neighborhoods have HOA architectural review for exterior changes, which we prepare and submit. Typical Pleasanton kitchen: four to eight weeks of design and permitting, six to ten weeks of construction, with a written schedule in the proposal and weekly updates.
Open-Plan Kitchen Remodels
Removing walls, adding beams and reworking the floor plan so the kitchen opens to the living space, with engineering and permits handled.Full Kitchen Gut Remodels
Islands, Pantries and Storage
Electrical and Plumbing Updates
New circuits, panel upgrades, gas or induction, and plumbing rerouted for the new layout, all permitted and inspected.Kitchen Additions and Bump-Outs
Bathroom Remodeling in Pleasanton
Whole-Home Remodels in Pleasanton
When the kitchen is part of a bigger plan: layouts, baths, systems and finishes under one contract.General Contractor in Pleasanton
Why Pleasanton Homeowners Choose Smith & Son for Their Kitchen
Pleasanton homeowners have plenty of contractors to choose from for a kitchen remodel. The ones who hire us usually say the same three things afterward: the proposal was itemized and the price held, Lance was on the job and reachable, and the house was clean and secured every evening.
Here is what that looks like in writing. You get a fixed-price, itemized proposal before work starts and no change orders without your signature. You get one project manager who is your point of contact from permit to final walk-through. You get weekly schedule updates and daily site supervision. And at the end you get manuals, warranties and as-builts handed over in one package. Smith & Son is licensed by the California CSLB (#1037951), insured and bonded.
Pleasanton Kitchen Remodeling FAQ
Do I need a permit to remodel my kitchen in Pleasanton?
Yes, for anything that moves plumbing, electrical or walls, from the City of Pleasanton’s Building and Safety Division. Cabinet fronts, counters, paint and flooring alone generally do not. We pull and manage the permits for every kitchen we build.
Can you remove the wall between my kitchen and living room?
Usually, yes. If it is a bearing wall we have an engineer size a beam and we install it with the proper posts and footings, then patch the floor and ceiling so the house reads as if it was always open.
How long does a kitchen remodel in Pleasanton take?
Design and permitting typically run four to eight weeks, and construction six to ten weeks for a full kitchen. We give you a written schedule with the proposal and update it weekly.
Do you handle design and material selection?
Yes. We work design-build: layout, cabinetry, counters, lighting and finishes are selected with you before the fixed-price proposal, so the price holds and the schedule does not wait on decisions.
Can we live in the house during the work?
Often, yes, if we can phase the work so you keep a working kitchen or bath. For larger projects it is sometimes faster and less expensive to move out. We will give you an honest answer at the first site visit.